Recycled rubber flat base layer of cement concrete (dry) → clean-up site → end of plastic ingredients → mixing → paving → defoaming → curing → surface plastic ingredients → mixing → paving → antifoam → Caesar particles → → rollglue → → completion detection point line measurement drawing a line →
Plastic tennis court laying process description:
First check the flatness of the base layer on the concave and convex parts of the leveling (such as cement concrete foundation need pickling)Glue the end of the laying of:
Foundation before laying underfill cleaned, ready for a good construction tools.
(1) in accordance with the process requirements to measure the location of the construction line, place the construction line.
(2) the laying of the venue side of the site width, one-time scraping gum.
(3) Squeegee speed uniform, timely, open at the end, depression, raised at the fill plastic or gelling.
(4) into the rubber, the full inspection, to ensure that the thickness of surface plastic laying.
Surface glue paving:
Squeegee (1) to shorten the interval of every barrel of glue, so that uniform gelation speed.
(2) at all times observe the thickness of the plastic surface.
(3) shave gel before curing of the rubber surface, sprinkle with plastic particles to wait until fully cured, cleaned up the excess surface rubber.
(4) spray, ensure that the particles do not fall off.
The process line spray program:
Accordance with the current standard of tennis venues and facilities to accurately measure the location of the processing line, and then stencilled with polyurethane paint.
The main material of the plastic tennis courts:
Two-component polyurethane paste, one-component polyurethane glue, particles, silicon PU particles, the EDPM particles, black waste tire particles.